View Detailed Profile
UP 7406 leads stacktrain with shiny DPU helper

UP 7406 leads stacktrain with shiny DPU helper

After the track equipment passed, a

UP #7406 Leads an Intermodal through Cortland, IL

UP #7406 Leads an Intermodal through Cortland, IL

some more stacks.

UP 7406 flies through Ontario with an intermodal

UP 7406 flies through Ontario with an intermodal

UP 7406 flies through Ontario with an intermodal

UP #7406 leads a Westbound Z train past Gilbert siding (2nd train)

UP #7406 leads a Westbound Z train past Gilbert siding (2nd train)

UP #7406 leads a Westbound Z train past Gilbert siding (2nd train)

UP 7406 Leads a Z-Train, Galesburg, IL

UP 7406 Leads a Z-Train, Galesburg, IL

UP 7406

UP 7406 GEVO New K5HL With AC44CTCWE Power Leads Manifest Magnolia,Tx

UP 7406 GEVO New K5HL With AC44CTCWE Power Leads Manifest Magnolia,Tx

A

UP 7431 & 4000 Lead Stack Train, ACe On The Rear

UP 7431 & 4000 Lead Stack Train, ACe On The Rear

A

UP 7406 heads west thru Rochelle and into Global 3, 6-1-13.

UP 7406 heads west thru Rochelle and into Global 3, 6-1-13.

The first westbound of the day as this

UP GEVO 7405 leads a fast moving stack train through Ontario

UP GEVO 7405 leads a fast moving stack train through Ontario

UP GEVO 7405 leads a fast moving stack train through Ontario

UP 7406 Rochelle,IL 10/14/13

UP 7406 Rochelle,IL 10/14/13

UP 7406

UP 7406 North, St. Anne, IL

UP 7406 North, St. Anne, IL

UP 7406

UP 7406, and 3979 Global 3 Rochelle RR Days 2013

UP 7406, and 3979 Global 3 Rochelle RR Days 2013

A long

UP 8075, 8146, 5098 lead stacktrain and meet UPY 733, 724, 705 on push pull local

UP 8075, 8146, 5098 lead stacktrain and meet UPY 733, 724, 705 on push pull local

As a