Media Summary: Im Jamal and im jumping from nine circles (hard demon) to Wasn't sure to upload this or not, but I'm leaving for about a week and I haven't exactly been posting here. So, fuck it. IL progs tend ... not that bad of a week overall just cuz i kinda just built some consistency and now im think im ready to do 39-100 soon.

Sonic Wave 25 Progress Report - Detailed Analysis & Overview

Im Jamal and im jumping from nine circles (hard demon) to Wasn't sure to upload this or not, but I'm leaving for about a week and I haven't exactly been posting here. So, fuck it. IL progs tend ... not that bad of a week overall just cuz i kinda just built some consistency and now im think im ready to do 39-100 soon. I have the level in 3 runs; 0-45 32-65 64-100 like 4.9k attempts so far Both drawings in the thumbnail drawn by my best friend ...

Photo Gallery

Sonic Wave 25%(Progress Report #2)
Sonic Wave // Progress Report #1
Sonic wave progress report #1 25%
Sonic Wave Rewind (25% progress)
Sonic Wave - Progress Report #1
Sonic Wave January Progress Report
[Verifying] Sonic Wave V2 36% (World Record!)
Sonic Wave progress report #1
Sonic Wave To The Golden: PROGRESS REPORT #3
PROGRESS REPORT: Sonic Wave 45%
SWF  ~ PROGRESS REPORT
stream 1 sonic wave progress report
View Detailed Profile
Sonic Wave 25%(Progress Report #2)

Sonic Wave 25%(Progress Report #2)

geometrydash #gd #gaming.

Sonic Wave // Progress Report #1

Sonic Wave // Progress Report #1

Showcase: @gdatomic.

Sonic wave progress report #1 25%

Sonic wave progress report #1 25%

Im Jamal and im jumping from nine circles (hard demon) to

Sonic Wave Rewind (25% progress)

Sonic Wave Rewind (25% progress)

Sonic Wave

Sonic Wave - Progress Report #1

Sonic Wave - Progress Report #1

geometrydash #

Sonic Wave January Progress Report

Sonic Wave January Progress Report

blud.

[Verifying] Sonic Wave V2 36% (World Record!)

[Verifying] Sonic Wave V2 36% (World Record!)

Wasn't sure to upload this or not, but I'm leaving for about a week and I haven't exactly been posting here. So, fuck it. IL progs tend ...

Sonic Wave progress report #1

Sonic Wave progress report #1

more videos like this in the future!

Sonic Wave To The Golden: PROGRESS REPORT #3

Sonic Wave To The Golden: PROGRESS REPORT #3

not that bad of a week overall just cuz i kinda just built some consistency and now im think im ready to do 39-100 soon.

PROGRESS REPORT: Sonic Wave 45%

PROGRESS REPORT: Sonic Wave 45%

I have the level in 3 runs; 0-45 32-65 64-100 like 4.9k attempts so far Both drawings in the thumbnail drawn by my best friend ...

SWF  ~ PROGRESS REPORT

SWF ~ PROGRESS REPORT

First and final

stream 1 sonic wave progress report

stream 1 sonic wave progress report

this level is fun.

sonic wave 26-56 aka the first drop (progress report 1)

sonic wave 26-56 aka the first drop (progress report 1)

lets gooooooooo first actual