Media Summary: Mainlines are road bedded and I'm adding a staging yard to the Outer mainline is down and got some things from ModelTrainStuff.com and bought a few items at a local train store. New motive power, the double track mainline is complete, ballast crews have been working hard and the BArailsystem yard/diesel ...

Layout Update 4 24 2012 - Detailed Analysis & Overview

Mainlines are road bedded and I'm adding a staging yard to the Outer mainline is down and got some things from ModelTrainStuff.com and bought a few items at a local train store. New motive power, the double track mainline is complete, ballast crews have been working hard and the BArailsystem yard/diesel ... Quite a bit of progress. Most of the rough terrain is done as well as some painting.

Photo Gallery

Layout update 4-24-2012
layout update 4/11/2012
Layout Update 4-28-2012
layout update 4
Lionel O Scale Layout Update # 4 04-02-2011
Layout Update 4-19-2012
Layout Update     4-10-2012
Layout update - September 2012
layout update number 4 ( two new engines ) (10-22-12)
Layout Update 4. Dec.23.2012
Layout update - June 2012
O gauge train layout update 4
View Detailed Profile
Layout update 4-24-2012

Layout update 4-24-2012

Mainlines are road bedded and I'm adding a staging yard to the

layout update 4/11/2012

layout update 4/11/2012

just a little

Layout Update 4-28-2012

Layout Update 4-28-2012

Outer mainline is down and got some things from ModelTrainStuff.com and bought a few items at a local train store.

layout update 4

layout update 4

layout update 4

Lionel O Scale Layout Update # 4 04-02-2011

Lionel O Scale Layout Update # 4 04-02-2011

Since my last

Layout Update 4-19-2012

Layout Update 4-19-2012

Had a

Layout Update     4-10-2012

Layout Update 4-10-2012

Layout update for April

Layout update - September 2012

Layout update - September 2012

New motive power, the double track mainline is complete, ballast crews have been working hard and the BArailsystem yard/diesel ...

layout update number 4 ( two new engines ) (10-22-12)

layout update number 4 ( two new engines ) (10-22-12)

same as description.

Layout Update 4. Dec.23.2012

Layout Update 4. Dec.23.2012

I finally got around to doing another

Layout update - June 2012

Layout update - June 2012

Quite a bit of progress. Most of the rough terrain is done as well as some painting.

O gauge train layout update 4

O gauge train layout update 4

Little more work done to the mountain.

Layout Update 4: Prgress Pt. 2

Layout Update 4: Prgress Pt. 2

Hey guys, thanks