Media Summary: Attack line deployment to door approximately 50' from engine. *200' 1.5” 3-stack cross-lay Flat Load Clinic - Loading the double stack Flat Load In this scenario we're going to demonstrate a traditional
Flat Load Clinic Quick Connect - Detailed Analysis & Overview
Attack line deployment to door approximately 50' from engine. *200' 1.5” 3-stack cross-lay Flat Load Clinic - Loading the double stack Flat Load In this scenario we're going to demonstrate a traditional Split – This method is chosen if the entire 200' is needed for the stretch but the area provided is smaller than the fireman would ... Triple – This method is chosen for a straight stretch 66' or more with no obstacles. The fireman grabs the nozzle and the 2nd dog ... Take and Break – This method is chosen if the stretch only requires 50-100' of hose. Vehicle fire, trash fire, etc. The
Purchase all 192 videos in the Essentials of Fire Fighting, 6th Edition Skills Video Series: ...