Media Summary: set up 9 5/8" casing hanger with hanger setting tools. Previously, when using a saw, we needed pinning, and the time taken was over an hour per cut. With our technology, we've been ... Beveling and leveling of 9-5/8" casing after setting casing hanger and final cut.

Setting 9 5 8 Casing - Detailed Analysis & Overview

set up 9 5/8" casing hanger with hanger setting tools. Previously, when using a saw, we needed pinning, and the time taken was over an hour per cut. With our technology, we've been ... Beveling and leveling of 9-5/8" casing after setting casing hanger and final cut. Liner Hanger is a tool/system that is used to hang a liner in a production well. Liner is similar to As part of the overall drilling operation, Rough cut 9-5/8" casing to drain out mud from the casing above the Wellhead.

Photo Gallery

set up 9 5/8" casing hanger with hanger setting tools.
Cutting 9 5/8" casing with 7" inside and cement in between.
OFFLINE  RACKING STAND 9 5/8" CASING
running 9 5/8 casing in south texas
Beveling and leveling of 9-5/8" casing after setting casing hanger and final cut.
Liner Hanger from Baker Hughes
Cementing Operations
#Part:01 Run Casing 9-5/8" #Tenaris Blue
RIH 9-5/8" Casing scraper trip.
Landing 9 5/8 Surface Casing
Rough cut 9-5/8" casing to drain out mud from the casing above the Wellhead.
Slotting and Jetting 9 5 8 Casing
View Detailed Profile
set up 9 5/8" casing hanger with hanger setting tools.

set up 9 5/8" casing hanger with hanger setting tools.

set up 9 5/8" casing hanger with hanger setting tools.

Cutting 9 5/8" casing with 7" inside and cement in between.

Cutting 9 5/8" casing with 7" inside and cement in between.

Previously, when using a saw, we needed pinning, and the time taken was over an hour per cut. With our technology, we've been ...

OFFLINE  RACKING STAND 9 5/8" CASING

OFFLINE RACKING STAND 9 5/8" CASING

Made up

running 9 5/8 casing in south texas

running 9 5/8 casing in south texas

running

Beveling and leveling of 9-5/8" casing after setting casing hanger and final cut.

Beveling and leveling of 9-5/8" casing after setting casing hanger and final cut.

Beveling and leveling of 9-5/8" casing after setting casing hanger and final cut.

Liner Hanger from Baker Hughes

Liner Hanger from Baker Hughes

Liner Hanger is a tool/system that is used to hang a liner in a production well. Liner is similar to

Cementing Operations

Cementing Operations

As part of the overall drilling operation,

#Part:01 Run Casing 9-5/8" #Tenaris Blue

#Part:01 Run Casing 9-5/8" #Tenaris Blue

Proses Run

RIH 9-5/8" Casing scraper trip.

RIH 9-5/8" Casing scraper trip.

RIH 9-5/8" Casing scraper trip.

Landing 9 5/8 Surface Casing

Landing 9 5/8 Surface Casing

Landing

Rough cut 9-5/8" casing to drain out mud from the casing above the Wellhead.

Rough cut 9-5/8" casing to drain out mud from the casing above the Wellhead.

Rough cut 9-5/8" casing to drain out mud from the casing above the Wellhead.

Slotting and Jetting 9 5 8 Casing

Slotting and Jetting 9 5 8 Casing

Slotting and Jetting 9 5 8 Casing